Provide evaluation support for project design architectural firm for recently completed police training facility at Santa Rosa Junior College. Initial evaluation processes consisted of water testing at the roof system and vertical walls of this concrete tilt-up building structure. Water entry noted through the tilt-up concrete column caps and through concrete cracks in the tilt-up panels, even though the panels had previously been coated with an elastomeric coating system. Determinations were made that the column caps were not adequately caulked with sealant at the interface with the tilt-up panels. Some wall cracks were noted telegraphing through the elastomeric coating system. Recommendations were made to install sealants at the column cap joints and reapply additional elastomeric coating with better detailing at known crack areas.